Examination Shall be Done Before Concrete Batching Plant Working

UserPost

12:27 am
January 9, 2017


dwlinda

Veteran

Posts: 272

1

Before the concrete batching plant working, the following examination shall be don:

Henan Daswell Machinery is a professional manufacturer of construction machine for almost 30 years in China. We are dedicated to supplying our customers with best service and products, our major products include:diesel concrete mixer,decoration villa,cement batch plant,If you are interested in our products, please contact us freely: sales@daswell.com

(1) Mixing drum’s transmission parts mini batching plant egg laying block machine, motion parts, bin gate small concrete batching plants, hopper gate, etc. Make sure no struck.

(2) The oil height of lubrication oil tank meets standard requirements;

(3) Open the gas valve discharge excess water of water-gas separator, open sewage plug of air tank discharge oil-water mixture;

(4) The steel wire rope of lifting hopper or dragline install and twine in a right way. Steel wire rope and pulley meet standard requirements, and the brake is sensitive and effective.

(5) Each parts bolts are tightened, each inlet and discharge valves without over wear, each belts tension are appropriate, no deviation;

(6) All control and display part of the weighing device are operating smoothly, the accuracy meets the standard;

(7) All electrical devices can effectively control the mechanical movement, the contact point and the moving and fixed contact no obvious damage.

If you want to know more of the examination of the concrete mixing plant, welcome to contact Daswell, we will do our best to support you.