300 t/d Cement Production Line
[Image Removed by User]
Overview
300t/d cement production line designed by Great Wall machinery, fully learns from the lessons and experiences of more than 20 years of NSP production line design, advanced vertical roller mill grinding system and DCS automatic control system.
Application Cement Plant, Thermal Power Plant
Annual Output 300 tons per day
Process Type New Dry Process
Blaine Fineness 3300-3800 cm²/g
[Image Removed by User]
Features
1. Advanced Technology Brings Lower Power Consumption.
Compared with traditional cement production line, the 300 t/d cement plant designed by Chaeng uses lower energy consumption equipment in the main part of energy consumption, such as vertical raw mill, vertical coal mill,vertical cement mill, etc., and the energy saving effect is very significant, which can reduce energy consumption with an average of 15-20 kWh/t.
2. Reasonable Design, Reduces Dust and Noise Effectively
Cement production has always been one of the leading causes of environmental pollution, thus more and more cement plant is looking for a solution to reduce noise and dust pollution. Chaeng fully considers the sustainable development in the design, reducing dust through campus greening, filter, etc. Since the introduction of noise control programs in key areas, the factory noise is lower than the national standard.
3. Shorter Delivery Time, Earlier Profits
With large supporting cast steel companies and large machining workshop, Chaeng has 120t casting ability and can supply complete spare parts. Furthermore, with a variety of long-term cooperation and first-class equipment suppliers, it greatly shortens delivery cycle, and makes your profit in the shortest possible time.
CHAENG (Xinxiang Great Wall Machinery) has a history of more than 50 years and has accumulated rich experience in cement machinery. At present, we have been able to supply 300-5000 t/d cement EP project, providing solutions for the world’s growing demand for cement.
300 t/d cement production line designed by CHAENG Great Wall machinery, fully learns from the lessons and experiences of more than 20 years of NSP production line design, the general layout scheme, process layout, equipment selection, automatic control level, etc. and combines with today’s international advanced production concept to optimize design. It’s composed of raw materials preparation, raw meal grinding, raw meal homogenization, clinker burning, cement mill grinding, packaging, delivery and so on. The cement equipment in the production line include: raw materials vertical roller mill, vertical coal mill, cement rotary kiln, cement ball mill, cyclone preheater and grate cooler, etc.
[Image Removed by User]
Configuration
Raw Material Vertical Roller Mill
1) Model: Ф2.4×8m
2) Max. feed size: ≤25mm
3) Moisture of finished product: 0.5~1.0%
4) Max moisture of material: 5%
5) Fineness of finished product: 80μmR10~12%
6) Capacity: 30t/h
7) Installed Power:570kw
Preheater
Preheater:
C1: Ф2570mm
C2 : Ф2770mm
C3 : Ф2770mm
C4: Ф2940mm
Capacity: 300t/d
Preheater Fan
1) Type: W6-29No 21.4D
2) Capacity: 100000m3/h
3) Pressure: 7200Pa
4) Power:400kW
Rotary Kiln
1) Model: Ф2.8 X 44m
2) kiln pitch: 3.5%
3) rotary speed: 0.375-3.3r/min
4) Capacity: 330t/d
5) Motor Power:90kw
Clinker Cooler
1)Type :Ф2.5 X25m
2)Capacity:300t/d
3)Clinker temperature at outlet : ≤100℃
Cement Mill
1) Model: Ф2.4 X 8m
2) Max. feed size: ≤25mm
3) Fineness of finished cement: 3200cm²/g
4) Capacity: 30t/h
5) Installed Power: 570kw
Packing machine
1) Type: 4RSE
2) Capacity:60 t/h
3) Accuracy:±150g deviation as average of 10
Coal Mill
1) Model: Ф2.2 X 4.4m
2) Max. feed size: ≤25mm
3) Capacity: 8t/h
4) Installed Power: 250kw
Turnkey Cement Plant, GGBS Plant,Rotary Kiln,Vertical Roller Mill, Ball Mill, Rotary dryer, Custom Steel Castings,and so on.
CAHENG
More information : http://cementgrindingmill.com/
CHAENG (Great Wall Machinery Co.,Ltd)
Mengzhuang Town, Huixian City, Henan Province, China
whatsapp:008618738136372
Emai/skypel: tony@chaeng.co